Timber Framers Guild logo

Rendezvous

Search Online Store Resource Guide Contact Us

Sept. 18-22 Panel Installation: Part 2



On Sept. 18-20, crews from Foard Panel, PanelPros, and Winter Panel along with several students are installing about 7,000 sq. ft. of panels on the Gould Farm barn.

Barn wall panels
The barn early on Tuesday afternoon with most of the wall panels installed.






Gable panelStep 2

Installation of the gable panels.



Gable


Joe, Brian
Left: Joe Turco and Brian Googan.



BACK     NEXT