Past Projects |
|
Palomar's Timber Framing Workshop
continued![]() A gable-end rafter is test fitted into an assembly.
The gable-end rafter is lifted into place during the raising.
Final assembly details. Note through tenon on scarfed posts. ![]() Palomar's Woodworking Department held its annual awards picnic in conjunction with the timber frame raising. The event featured students' work including these wooden hand planes, tool boxes and furniture. ![]() ![]() Sam Maloof, one of the world's premier woodworkers, was honored at the awards picnic and participated in the raising. Right: While most of the frame was hand raised, a forklift helped with heavier pieces. Here the tower roof assembly is ready to be lifted by a crane rented just for this "pick."
The crane lifts the roof assembly toward its final resting place. ![]()
The tower crew directs the roof assembly onto the post top tenons. Right: Roof landing successful!
The completed bell tower pavilion at the main entrance to Palomar College.
The workshop crew assembled on the frame. ![]() Guild members (from left) Diane and Chris Feddersohn, Russ Filbeck, and Will Beemer relax on one of the pavilion's benches after the raising. |
![]() Palomar's Woodworking Department held its annual awards picnic in conjunction with the timber frame raising. The event featured students' work including this jewelry box. Back to News | |||||||||
| ||||||||||